TitleCustomized /OEM Injection Mold Parts Mould Tool and Die Nitrogen Spring Nitrogen Gas Cylinder Gas Spring for Die Casting Moulds
Introduce
 
What kinds of die casting we can supply?
 
TypeDie casting or pressure die casting
Produce ProcessDrawings→ Mould design→ Mould making→ Die casting → Deburring → Drilling holes → Tapping → CNC Machining → CNC control center → Polishing → Surface Finishing → Assembly → Quality Inspection → Packing→ Delivery
Material AvailableAluminum alloy: ADC12, ADC10, A356, A380, A413.2, A360, ADC6, DC01
Zinc alloy: Zamak3, Zamak5, Zamak8
ApplicationAerospace, Microwave communication, Optical equipment, Lighting industry, Measuring instruments, Automation equipment, Medical equipment, Household appliances, Digital products, Automobile industry, Security products, Sporting goods, Health supplies, Etc.
Software AssistancePro-E,Solid Work,UG,AutoCAD,CATIA,CAD
EquipmentDie casting machine: 88T/200T/280T/400T/500T/800T/1250T. CNC machining centers, Electric Discharge Machines, Grinding machine, CNC turning, CNC lathes, Electrical pulse, Line cutting, Milling, Drilling, Grinding.
Mainly Testing FacilityThree-dimensional measuring instrument, Universal tensile testing machine, Salt spray test box, Dynamic balance detector, Pneumatic detection, Universal hardness tester.
Surface TreatmentTrimming, Deburring, Polishing, Shot blasting, Sandblasting, Tumbling, Powder coating, Anodizing, Chrome, Zinc, Electrophoresis, Passivation, Chemical coating.
Quality AssuranceTechnicians self-check in production, Engineer spot check in production, QC inspect after products finished.
Payment termsTT/Paypal , Western Union, VISA (40% in advance, 60% balance before shipment)
ShipmentBy express ( DHL/FEDEX/UPS/EMS/TNT.etc)
0-100kg: air freight priority, >100kg: sea freight priority. It depends on the customers' requirements.
Certification
SGS Audited Factory.
ISO9001:2015 international quality management certification.
High and New Technology Enterprise(certificate No. GR201944203331).
Lead Time10-30days, depend on quantity.
The parts on the picture just show our manufacturing capacities, if you have any parts similar manufacturing methods, please send us the drawings and specifications for our accurate quotation.   



FAQ
1: What are our Advantages over others?
a).We are the Manufacture,not a trading company, less cost purchase, competitive price.
b).Senbao is a precision hardware processing manufacturer with nearly 20 years of experience.
f).During our cooperation: We have QC department,Sales department,Engineer department, Shipping department.,After-Sales,Department,
to serve you all the time.
2. Can you sent the product drawing to me?
Pictures on website was just for reference, More correct information and some special requirements,
Please kindly contact us. 
3. Can you make OEM order?
Yes, OEM/ODM orders are welcome. You are warmly welcome to send the your designs to us, We will offer you reasonable prices with high
quality Please provide us the drawings or please tell us the detailed information what you need, we can copy the parts according to your 
information.
4. How long can I expect to get the sample?
Samples will be ready for delivery in 3-10 days after we confirmed the shop drawings, The samples will be sent to you via express and arrive in
3-5 days. 
5. What about the lead time for mass production?
Honestly, normally it is 15-30 days, and it depends on the order quantity and the season you place the order. Generally speaking, (if you project is urgent, we can help you short it), we suggest that you start inquiry one months before the date you would like to get the products at your country. 
6. What are your terms of delivery?
We accept EXW, FOB, CNF, etc. You can choose the most convenient one. Regarding to the shipping cost, if you have your own express account
that will be welcome. 


 
Brand
Unit
Price $(usd)
Minimum order quantity0
Tag Model NO. :Senbo Pressure Chamber Structure :Horizontal Tolerance Grade :6 Casting Surface Quality Level :2 Certification :RoHS, ISO 9001:2008 Abject of Manufacture :Metal Forming Process
Keyword
Image View
Create Time2023-03-13 04:42:43
Update TimeNot set
View Companyview company